Sl.No | Particulars | Area / Unit | Unit | Rate | Amount |
---|---|---|---|---|---|
1 | TV Unit using plywood. Storage at the bottom | 42 | SFT | 700 | 29,400.00 |
Simple TV Frame | 6 | RFT | 1200 | 7,200.00 | |
2 | Pooja mandir inside only storage facility. Simple one. |
30 | SFT | 700 | 21,000.00 |
3 | Crockery unit | 24 | SFT | 1200 | 28,800.00 |
23 | SFT | 500 | 11,500.00 | ||
Kitchen | |||||
1 | Provision of undercabinets using 18mm gurjun plywood |
44 | SFT | 1200 | 52,800.00 |
2 | Provision of overhead cabinets using 18 mm gurjun plywood |
29 | SFT | 1200 | 34,800.00 |
3 | Overhead loft in the kitchen using 18mm gurjun plywood |
34 | SFT | 1200 | 40,800.00 |
Provision of Kitchen hardware | |||||
4 | One cutlery unit, one cup & saucer, one thali, one side pullout and corner shelve. |
1 | NO | 7500 | 7,500.00 |
Master Bed Room | |||||
1 | Wardrobe with 2 sliding doors, Using 18mm plywood. |
70 | SFT | 1200 | 84,000.00 |
2 | Dressing table arrangement | 21 | SFT | 1200 | 25,200.00 |
3 | 14 | SFT | 150 | 2,100.00 | |
CBR | |||||
Wardrobe with 2 sliding doors, Using 18mm plywood. |
68 | SFT | 1200 | 81600 | |
Dressing table arrangement | 21 | SFT | 1200 | 25200 | |
14 | SFT | 150 | 2100 | ||
Shoe Rack | 12 | SFT | 1200 | 14400 | |
Total | ₹ 468,400 | ||||
Service Charges | ₹ 15,000 | ||||
GRAND TOTAL (Rupee:Four Lakhs Eighty Three Thousand Four Hundred Only) |
₹ 483,400 |
TERMS & CONDITIONS
1. Advance 50% of the bill to be paid along with work order in favour of
M/s HETIKA CRAFTS PVT LTD
2. Bank Details:
Name: HETIKA CRAFTS PVT LTD
Bank Name: OBC Bank, Balanagar Branch
A/c No: 11531132000431
IFSC Code: ORBC0101153
3. 40% after supplying of all materials at the work site.
4. 10% on completion of work and handing over.
5. Work will be completed in 60 working days after providing all necessary work
requirements.
6. Any work apart the specifications will be charged extra as per execution cost.
7. Power supply & water to be provided wherever necessary at site.
8. Lockable room to be provided at site for safe storage of material and tools.
9. Any civil work defects to be rectified at site from your end.
10. Above given areas are based on the details provided to us. Actual
measurements will be done at site as per site conditions & joint measurement.